Back to Projects
🏭
Industrial

Penna Cement Plant

📍 Nalgonda, Telangana · 2022

2 MW

Capacity

₹1.8Cr/yr

Annual Savings

2.5 years

ROI Period

1,800 tonnes/yr

CO₂ Saved/yr

📋 Project Overview

Large-scale captive power plant for cement manufacturing. PPA financing model with zero capital investment by the client.

⚠️ The Challenge

Cement plant with electricity bills of ₹2.5 crores annually. Needed a large-scale solution with minimal capital outlay.

💡 Our Solution

2 MW ground-mounted solar farm on adjacent land. PPA model — HK Energies built, owns, and operates. Client pays only for power consumed.

Results Achieved

Zero capital investment. Electricity cost reduced by 72%. 25-year PPA locks in low energy rates. Significant reduction in carbon footprint.

Want a similar project for your property?

Get a free site survey and custom ROI projection — at zero cost.

Book Free Site Survey →
Chat on WhatsApp